Call Before You Dig
Before excavating, it's important to know where underground electrical, cable, water, or gas lines are located. Contractors and home owners are reminded to call 8-1-1 before excavating.
Once contractors and home owners call 8-1-1 (PA One Call), utility companies visit the site to mark the location of underground lines.
Visit PA One Call for more information.
Updated September 29, 2026.
Installation requirements of center load pole mounted service with entrance cable-generator switch.
Updated September 29, 2026.
Installation requirements for mast type service for permanent buildings.
Updated September 29, 2026.
Installation requirements for meter loop services.
Updated September 29, 2026.
Installation requirements of an overhead service for recreational vehicles.
Updated September 29, 2026.
Installation requirements for overhead service to a permanent building.
Updated September 29, 2026.
Specifications for pad-mount transformer vault.
Updated September 29, 2026.
Installation requirements for underground pedestal mounted services for mobile homes and double-wide applications.
Updated September 29, 2026.
Installation requirements of pole mounted services for mobile homes and similar applications.
Updated September 29, 2026.
Installation requirements for temporary service of construction of buildings requiring an overhead service.
Updated September 29, 2026.
Specifications for primary underground installation trench detail.
Updated September 29, 2026.
Specifications for secondary service underground installation trench detail.
Updated September 29, 2026.
Installation requirements of underground service for a permanent building.
